AG Active Play™
AG Active Play™
Gentle Rain Pods — original AG concept visualisation; final geometry and water effects pending engineering

Original AG concept visualisation. No manufactured geometry, water performance or site fit is implied.

AG-WAT-0034 · R01

Gentle Rain Pods

New R01 concept - engineering review pending

Separated pods offer selectable soft rain moments and dry pauses between experiences.

Water-play interaction

Separated pods offer selectable soft rain moments and dry pauses between experiences.

Technical and commercial data are Pending Engineering Verification. This is a working concept record, not an approved manufactured product.

INDEPENDENT DESIGN DIRECTION

A form.
A way to interact.

Three independently approachable rounded rain canopies with open sides.

Proposed material direction

Proposed stainless-steel structure with project-specific comparison of 304 and 316L; HDPE, GRP/GFRP and engineered-composite accents may be evaluated. Grade, finish, UV, chemical and corrosion resistance remain Pending Engineering Verification.

Accessibility considerations

  • Choice and retreat
  • Varied approach positions

Originality review

Preliminary independent design study compared with the existing AG Ripple/Splash directions. Differentiating form: Three independently approachable rounded rain canopies with open sides. Generic water-effect principles are not claimed as exclusive. No legal/IP clearance, prototype approval or engineering feasibility is established.

CONCEPT DATA / EVIDENCE STATUS

Clarity before specification.

Missing values are marked Pending Engineering Verification. Applicable standards, materials and operating requirements must be confirmed against the actual product scope and project location.

Identity

Model Code
AG-WAT-0034
Classification
Original AG concept proposal
Design Revision
R01
Concept Owner
A G Active Play (FZE)
Source Evidence
Independent AG functional brief and original AI-generated design study; preliminary similarity review only
Ip Clearance
Pending Engineering Verification
Manufacturer Status
Pending Engineering Verification
Source Review Date
2026-11-22
Verification Date
Pending Engineering Verification

Geometry

Length (mm)
Pending Engineering Verification
Width (mm)
Pending Engineering Verification
Height (mm)
Pending Engineering Verification
Product Footprint
Pending Engineering Verification
Required Operating Area
Pending Engineering Verification
Installation Interface
Pending Engineering Verification
Fixings
Pending Engineering Verification
Foundation Type
Pending Engineering Verification
Structural Review
Pending Engineering Verification
Maintenance Envelope
Pending Engineering Verification
Spray Reach
Pending Engineering Verification
Spray Direction
Pending Engineering Verification
Interaction Clearance
Pending Engineering Verification
Intended Users
Pending Engineering Verification
Age Suitability
Pending Engineering Verification
Accessibility Assessment
Pending Engineering Verification

Construction

Material Direction
Proposed stainless-steel structure with project-specific comparison of 304 and 316L; HDPE, GRP/GFRP and engineered-composite accents may be evaluated. Grade, finish, UV, chemical and corrosion resistance remain Pending Engineering Verification.
Structural Material
Pending Engineering Verification
Stainless Steel Grade
Pending Engineering Verification
Composite Option
Pending Engineering Verification
Fasteners
Pending Engineering Verification
Weld Treatment
Pending Engineering Verification
Edge Treatment
Pending Engineering Verification
Protective Finish
Pending Engineering Verification
Uv Resistance
Pending Engineering Verification
Corrosion Resistance
Pending Engineering Verification
Chemical Resistance
Pending Engineering Verification
Replaceable Parts
Pending Engineering Verification
Maintenance Access
Pending Engineering Verification

Hydraulic

Water Effect Intent
Selectable gentle rain
Nozzle Count
Pending Engineering Verification
Nozzle Type
Pending Engineering Verification
Design flow (L/min)
Pending Engineering Verification
Operating pressure (bar)
Pending Engineering Verification
Connection Size
Pending Engineering Verification
Actuation
Pending Engineering Verification
Valve Requirements
Pending Engineering Verification
Operating Sequence
Pending Engineering Verification
System Compatibility
Pending Engineering Verification
Pump Interface
Pending Engineering Verification
Pipework Interface
Pending Engineering Verification
Drainage Interface
Pending Engineering Verification
Isolation
Pending Engineering Verification
Filtration
Pending Engineering Verification
Hygiene Review
Pending Engineering Verification

Commercial

Oem
Pending Engineering Verification
Manufacturer
Pending Engineering Verification
Prototype Status
Pending Engineering Verification
Evidence Files
Pending Engineering Verification
Certification
Pending Engineering Verification
Moq
Pending Engineering Verification
Production Feasibility
Pending Engineering Verification
Lead Time
Pending Engineering Verification
Installation Scope
Pending Engineering Verification
Warranty
Pending Engineering Verification
Price
Pending Engineering Verification
Quotation Status
Project-specific enquiry only
Approval Owner
AG technical and commercial team; independent specialists required

PROJECT DEVELOPMENT DOCUMENTS

Keep the
next steps together.

Available catalogue material supports early discussion. It is not an approved technical or manufacturing sheet.

Water Play section · AG Master Catalogue

EXPLORE THE FAMILY

Related design directions.

Explore Inclusive & Sensory Aquatic Play
WhatsAppLet’s talk play ↗