A credible OEM comparison starts with the legal manufacturer, the factory that will produce the named model and documents that match the quotation. Market presence or a strong catalogue alone does not qualify a supplier.
Planning guidance only · no project-specific engineering or supplier approval is implied.
ILLUSTRATIVE DESIGN CONCEPT · NOT A VERIFIED MANUFACTURER MODEL
PROJECT CONTEXT
Padel court OEM and wholesale sourcing
ENVIRONMENT / MARKET
Confirm the project country, local site conditions and operating environment.
TECHNICAL GATE
This is early planning guidance. Site conditions, local regulations, supplier information and qualified project engineering must be reviewed before specification or construction.
Qualify the entity behind the offer
Record the registered seller, manufacturer, factory address, authorised signatory and the role of any agent or distributor. Ask who is responsible for engineering, quality control, export packing, warranty and technical support.
Supplier names found through public research are discovery leads only. AG has not approved or appointed a padel manufacturer based solely on a public website or catalogue.
Check model-level technical evidence
A supplier’s evidence needs to identify the exact court model and revision. Review drawings, component schedules, structural information, glass and turf data, installation procedures and stated test or certification scope. Authenticate issuers and expiry dates where applicable.
Factory and quality-control information for the quoted product
Approved drawings, bill of materials and change-control record
Material data for glass, steel, coatings, fixings, turf and luminaires
Inspection plan, packing details, warranty terms and service parts
Define wholesale and private-label rights
Confirm whether the offer is direct OEM, authorised distribution, project resale or another model. Any private-label arrangement should state territory, permitted marks, artwork approval, product liability, warranty handling, exclusivity if any, and post-sale service.
AG Active Play India manufacturing is a planned future initiative. It is not presented as an operating factory or current production capability.
Compare commercial terms on one basis
Request a written quotation with currency, validity, Incoterm and named delivery point. Record court supply separately from freight, customs, unloading, civil works, installation and commissioning. Confirm lead time, payment milestones, warranty, spares and responsibility for delays or damage.
REVIEW CHECKLIST
Build the right brief around the site.
Use these points to invite comparable, evidence-backed proposals from qualified manufacturers and project consultants.
01
Verify company registration, factory address and actual manufacturing scope
02
Match the quote, drawings and material documents to the same model and revision
03
Check territory, brand-use, private-label, warranty and after-sales rights
04
Compare Incoterms, loading plan, lead time, spare parts and delivery responsibilities
ENGINEERING REVIEW
Evidence first. Specification after.
This is early planning guidance. Site conditions, local regulations, supplier information and qualified project engineering must be reviewed before specification or construction. Dimensions and installation requirements must be confirmed against the selected manufacturer’s approved documentation and local regulations.