AG Active Play™
AG Active Play™

ORIGINAL AQUATIC PLAY / UAE · GCC · INTERNATIONAL

From First Splash
to Adventure.

Original aquatic play environments. Cultural storytelling. Technical coordination. Spaces designed around people and place.

Concept visualisation · engineering and manufacturing approval pending
Original AG water-play garden concept; not a completed installation
48Preserved AG records
14Functional families
6Cultural directions

Original collection categories remain available as an independent filter.
Evidence before specification.

FOLLOW THE WATER

Eight families.
Different ways to play.

Choose a play interaction, from gentle ground effects to cooperative water experiments and cultural adventures.

48 ORIGINAL & PRESERVED AG RECORDS

Find your
starting point.

Concept descriptions explain intended interaction. Dimensions, flow, pressure, age suitability and certification are Pending Engineering Verification.

Refine the collection

Creative world and functional family are independent classifications. Accessibility and material filters show design intent, not assessed suitability.

48 concepts found

Your project · 0 units
PRESERVED CONCEPT

AG-WAT-0001

AG Ripple Table

Original visual concept exploring raised water discovery table with basins and channels, empty studio background. Geometry, materials, suitability and technical performance remain to be developed and verified.

Water Discovery & LearningWater Tables, Channels and Sensory PlayPreserved existing concept
PRESERVED CONCEPT

AG-WAT-0004

AG Splash Arch

Original visual concept exploring one freestanding curved water spray arch with small elegant water jets. Geometry, materials, suitability and technical performance remain to be developed and verified.

Spray Arches & Water CurtainsWater Tunnels, Arches and GatewaysPreserved existing concept
PRESERVED CONCEPT

AG-WAT-0007

AG Splash Cannon

Original visual concept exploring low pivoting water cannon mounted on a grounded pedestal with small water stream. Geometry, materials, suitability and technical performance remain to be developed and verified.

Interactive Water MechanicsInteractive Sprayers and ControllersPreserved existing concept

YOUR WATER-PLAY PROJECT

A shortlist.
A clearer brief.

Select concepts, adjust quantities and pass your brief to the quotation form. This does not submit an enquiry.

Your project and catalogue shortlist are saved in this browser. A quotation request preserves the submitted selection for AG review.

Open the shared Catalogue Library shortlist

Add concepts from the collection to begin.

Continue to quotation form

Add contact details, consent and CAD / BOQ files on the form. Submission is complete only after server confirmation.

CULTURAL WATER ADVENTURE

Stories that belong
to their setting.

Six independent directions connect water, architecture and landscape. Cultural interpretation and site-specific design require stakeholder review.

01

Arabian Oasis™

Abstract desert flora, rounded water gardens, palm-shadow geometry and shaded dry transitions; local planting and cultural interpretation require landscape review.

Discuss this direction
02

Al-Andalusia — Lost Water Gardens™

Original AG courtyard narratives, water channels and garden sequences, using restrained geometric interpretations without reproducing a historic monument.

Discuss this direction
03

Ancient Egypt Adventure™

River-delta and irrigation-learning ideas inform original AG water landscapes. Character artwork and cultural interpretation require separate approval.

Discuss this direction
04

India Stepwell Discovery™

Terraced visual rhythms and collaborative flow experiments interpret stepwell heritage without creating a descendable water basin or copying a monument.

Discuss this direction
05

China Mountain & Water Garden™

Abstract mountain silhouettes, meandering channels and gentle cascades explore the relationship of water, land and garden; cultural stakeholder review remains required.

Discuss this direction
06

Modern Coastal Adventure™

Contemporary coastal forms, abstract reef textures and sculptural water curtains create a landscape-led marine design direction.

Discuss this direction

DESIGN YOUR SPLASH PAD

Six places.
Six starting briefs.

Illustrative schemes combine different activity intensities, dry routes and a preliminary service strategy. They are not approved layouts.

Little Splash Garden original AG illustrative project scheme

Little Splash Garden

A gentle-water design brief for an early-childhood venue; age suitability is not assessed.

Review concept brief and shortlist

Area basis: No numeric site area, capacity, clearance or equipment footprint is assumed verified. This is a relationship diagram and shortlist; a site survey and verified operating envelopes are needed before setting out.

Proposed selection

  • 2 × AG-WAT-0012 · Palm Mist Disc
  • 2 × AG-WAT-0034 · Gentle Rain Pods
  • 1 × AG-WAT-0035 · Sensory Hand Table

Play zones

  • Quiet hand discovery
  • Optional gentle rain
  • Dry arrival and supervision edge

Accessibility and supervision

  • Provide a continuous dry bypass and distinct rest points
  • Review approach, reach, contrast, shade, sensory choice and supervision with intended users
  • Do not claim universal accessibility from a concept name

Plant and services

Demand-based gentle zones with a site-specific single-pass versus recirculation feasibility review.

  • Landscape levels and drainage
  • Shade, planting and surface-temperature control
  • Water supply, electrical power and treatment plant
  • Independent maintenance access and emergency circulation

Assumptions and exclusions

  • Illustrative shortlist quantities only; no approved layout or production order
  • No verified footprint, hydraulic duty, capacity, price or programme
  • Authority permissions, site surveys and final engineering excluded from this concept

Engineering hold points

  • Site and utility survey
  • Aquatic safety and accessibility review
  • Hydraulic, structural and water-quality engineering
  • OEM prototype and authority approvals
Request a bespoke quotation
Community Splash Park original AG illustrative project scheme

Community Splash Park

A modular public-space proposal with distinct activity intensities and open sightlines.

Review concept brief and shortlist

Area basis: No numeric site area, capacity, clearance or equipment footprint is assumed verified. This is a relationship diagram and shortlist; a site survey and verified operating envelopes are needed before setting out.

Proposed selection

  • 3 × AG-WAT-0009 · Oasis Ripple Jet
  • 1 × AG-WAT-0014 · Oasis Arc
  • 1 × AG-WAT-0021 · Twin Team Sprayers
  • 1 × AG-WAT-0023 · Water Pulse Beacon
  • 1 × AG-WAT-0036 · Low Stream Garden

Play zones

  • Ground-pattern play
  • Shared interactive centre
  • Quiet garden and dry bypass

Accessibility and supervision

  • Provide a continuous dry bypass and distinct rest points
  • Review approach, reach, contrast, shade, sensory choice and supervision with intended users
  • Do not claim universal accessibility from a concept name

Plant and services

Zoned demand activation and approved drainage; treatment and water-source strategy subject to utility and authority review.

  • Landscape levels and drainage
  • Shade, planting and surface-temperature control
  • Water supply, electrical power and treatment plant
  • Independent maintenance access and emergency circulation

Assumptions and exclusions

  • Illustrative shortlist quantities only; no approved layout or production order
  • No verified footprint, hydraulic duty, capacity, price or programme
  • Authority permissions, site surveys and final engineering excluded from this concept

Engineering hold points

  • Site and utility survey
  • Aquatic safety and accessibility review
  • Hydraulic, structural and water-quality engineering
  • OEM prototype and authority approvals
Request a bespoke quotation
Resort Oasis Water Garden original AG illustrative project scheme

Resort Oasis Water Garden

An architectural hospitality water-garden direction with planting and shaded transitions.

Review concept brief and shortlist

Area basis: No numeric site area, capacity, clearance or equipment footprint is assumed verified. This is a relationship diagram and shortlist; a site survey and verified operating envelopes are needed before setting out.

Proposed selection

  • 2 × AG-WAT-0016 · Palm Frond Shower
  • 1 × AG-WAT-0024 · Date Palm Rain
  • 2 × AG-WAT-0027 · Mangrove Mist
  • 1 × AG-WAT-0028 · Dune Flower
  • 1 × AG-WAT-0038 · Accessible Water Hub

Play zones

  • Arrival garden
  • Sculptural rain grove
  • Quieter shared discovery

Accessibility and supervision

  • Provide a continuous dry bypass and distinct rest points
  • Review approach, reach, contrast, shade, sensory choice and supervision with intended users
  • Do not claim universal accessibility from a concept name

Plant and services

Compare engineered recirculation with approved single-pass supply using verified demand and operating data.

  • Landscape levels and drainage
  • Shade, planting and surface-temperature control
  • Water supply, electrical power and treatment plant
  • Independent maintenance access and emergency circulation

Assumptions and exclusions

  • Illustrative shortlist quantities only; no approved layout or production order
  • No verified footprint, hydraulic duty, capacity, price or programme
  • Authority permissions, site surveys and final engineering excluded from this concept

Engineering hold points

  • Site and utility survey
  • Aquatic safety and accessibility review
  • Hydraulic, structural and water-quality engineering
  • OEM prototype and authority approvals
Request a bespoke quotation
Inclusive Discovery Lagoon original AG illustrative project scheme

Inclusive Discovery Lagoon

A zero-depth shared discovery intention with optional sensory experiences; the name does not imply a pool.

Review concept brief and shortlist

Area basis: No numeric site area, capacity, clearance or equipment footprint is assumed verified. This is a relationship diagram and shortlist; a site survey and verified operating envelopes are needed before setting out.

Proposed selection

  • 1 × AG-WAT-0030 · Water Measure Lab
  • 2 × AG-WAT-0034 · Gentle Rain Pods
  • 2 × AG-WAT-0035 · Sensory Hand Table
  • 1 × AG-WAT-0037 · Mist Journey
  • 1 × AG-WAT-0038 · Accessible Water Hub

Play zones

  • Shared hand discovery
  • Selectable mist route
  • Dry observation and retreat

Accessibility and supervision

  • Provide a continuous dry bypass and distinct rest points
  • Review approach, reach, contrast, shade, sensory choice and supervision with intended users
  • Do not claim universal accessibility from a concept name

Plant and services

Independent selectable zones, positive drainage and accessible service isolation; hygiene and sensory reviews before design approval.

  • Landscape levels and drainage
  • Shade, planting and surface-temperature control
  • Water supply, electrical power and treatment plant
  • Independent maintenance access and emergency circulation

Assumptions and exclusions

  • Illustrative shortlist quantities only; no approved layout or production order
  • No verified footprint, hydraulic duty, capacity, price or programme
  • Authority permissions, site surveys and final engineering excluded from this concept

Engineering hold points

  • Site and utility survey
  • Aquatic safety and accessibility review
  • Hydraulic, structural and water-quality engineering
  • OEM prototype and authority approvals
Request a bespoke quotation
Andalusia Lost Water Gardens original AG illustrative project scheme

Andalusia Lost Water Gardens

An original AG courtyard journey linking garden channels, flow experiments and fountain moments.

Review concept brief and shortlist

Area basis: No numeric site area, capacity, clearance or equipment footprint is assumed verified. This is a relationship diagram and shortlist; a site survey and verified operating envelopes are needed before setting out.

Proposed selection

  • 1 × AG-WAT-0029 · Stepwell Flow
  • 1 × AG-WAT-0031 · Canal Explorer
  • 1 × AG-WAT-0033 · River Gates
  • 2 × AG-WAT-0039 · Andalusia Fountain Trail
  • 1 × AG-WAT-0018 · Star Canopy

Play zones

  • Garden arrival
  • Courtyard flow learning
  • Fountain event and dry circulation

Accessibility and supervision

  • Provide a continuous dry bypass and distinct rest points
  • Review approach, reach, contrast, shade, sensory choice and supervision with intended users
  • Do not claim universal accessibility from a concept name

Plant and services

Coordinate channel cleanliness, complete draining, water quality and separate event zones with the specialist aquatic designer.

  • Landscape levels and drainage
  • Shade, planting and surface-temperature control
  • Water supply, electrical power and treatment plant
  • Independent maintenance access and emergency circulation

Assumptions and exclusions

  • Illustrative shortlist quantities only; no approved layout or production order
  • No verified footprint, hydraulic duty, capacity, price or programme
  • Authority permissions, site surveys and final engineering excluded from this concept

Engineering hold points

  • Site and utility survey
  • Aquatic safety and accessibility review
  • Hydraulic, structural and water-quality engineering
  • OEM prototype and authority approvals
Request a bespoke quotation
Destination Aquatic Adventure original AG illustrative project scheme

Destination Aquatic Adventure

A larger concept programme of coordinated water events and separate quieter alternatives.

Review concept brief and shortlist

Area basis: No numeric site area, capacity, clearance or equipment footprint is assumed verified. This is a relationship diagram and shortlist; a site survey and verified operating envelopes are needed before setting out.

Proposed selection

  • 3 × AG-WAT-0013 · Starburst Ground Crown
  • 2 × AG-WAT-0017 · Wave Curtain
  • 1 × AG-WAT-0021 · Twin Team Sprayers
  • 1 × AG-WAT-0044 · Splash Tower Mini
  • 1 × AG-WAT-0047 · Oasis Water Fortress
  • 1 × AG-WAT-0048 · Splash Bucket Beacon

Play zones

  • Energetic event zone
  • Cooperative discovery route
  • Quiet alternative and rest edges

Accessibility and supervision

  • Provide a continuous dry bypass and distinct rest points
  • Review approach, reach, contrast, shade, sensory choice and supervision with intended users
  • Do not claim universal accessibility from a concept name

Plant and services

Review separate event circuits, failsafe controls, plant access and simultaneous demand against verified nozzle and structure information.

  • Landscape levels and drainage
  • Shade, planting and surface-temperature control
  • Water supply, electrical power and treatment plant
  • Independent maintenance access and emergency circulation

Assumptions and exclusions

  • Illustrative shortlist quantities only; no approved layout or production order
  • No verified footprint, hydraulic duty, capacity, price or programme
  • Authority permissions, site surveys and final engineering excluded from this concept

Engineering hold points

  • Site and utility survey
  • Aquatic safety and accessibility review
  • Hydraulic, structural and water-quality engineering
  • OEM prototype and authority approvals
Request a bespoke quotation

WATER MANAGEMENT & ENGINEERING

The experience above.
The thinking below.

Choose a project pathway with qualified aquatic engineers and the relevant authority. These relationships are not construction P&IDs or approved specifications.

Flow-through / single-pass

Approved supply · backflow protection · controlled distribution · water features · approved drainage. Verify water quality, capacity and lawful discharge.

Engineered recirculation

Collection · balance storage · treatment · monitored controls · pumping · play features. Specialist design must establish filtration, disinfection, chemistry, monitoring and operation.

Approved water reuse

Separately assessed collection · appropriate treatment and storage · approved non-play use. No reuse is assumed permissible; establish authority approval and system separation.

Demand, zones and control

Consider activation, timed zones, water-use monitoring, maintenance isolation and safe shutdown. Final sequence and failsafe logic require an approved operating philosophy.

Aquatic safety review

Review drainage, slip resistance, spray forces, entrapment, temperature, hygiene, water quality, visibility, supervision and emergency access. Standard selection follows product scope, site and authority jurisdiction.

MATERIALS & MANUFACTURING

Design intent.
Evidence-led delivery.

AG coordinates original concepts, technical development and specialist sourcing. No record establishes completed manufacture, tested prototypes, stock or certification.

Stainless-steel selection

Evaluate 304 and 316L against project water chemistry, coastal exposure, crevices, finish and lifecycle requirements. Neither grade is universally suitable. Final grade and finish are Pending Engineering Verification.

Composites and panels

GRP/GFRP, HDPE and engineered composites are possible design directions. Validate UV, chemical and corrosion resistance, fixing interfaces, exposed edges and replacement access.

Fabrication readiness

OEM qualification, drawings, welds, coatings, anchors, foundations, prototype tests, MOQ, lead time, scope and warranty remain Pending Engineering Verification.

INCLUSIVE WATER PLAY

Different energies.
A shared experience.

Gentle discovery

Plan quieter sensory areas, optional water effects, shaded rest points and predictable wet-to-dry transitions. Assess intensity with intended users.

Shared interaction

Consider cooperative controls, varied approach positions and clear circulation. Accessibility design intent is not a claim of assessed universal access.

Visible and maintainable

Bring sightlines, supervision, slip resistance, emergency access, hygiene and maintenance together in the site-specific design.

THE AG PROJECT DESIGN PROCESS

From a first idea
to a considered brief.

Discover

Understand site, people, operations and ambitions.

Move

Explore active, gentle and shared interaction.

Learn

Review water, materials, authority and technical evidence.

Achieve

Develop a coordinated proposal and agreed scope.

Share

Plan handover, operational information and maintenance.

THE COLLECTION, TO KEEP

Take the next
conversation with you.

Download a PDF generated from the live Water Play catalogue records. It is for early project discussion, not an approved technical or manufacturing sheet.

Browse the live Water Play catalogue online ↗
Download the live Water Play Catalogue PDF ↓

The PDF reflects the current published catalogue records. Technical, manufacturing and commercial details remain subject to project-specific verification.

Explore the Master Cinematic Catalogue ↗

LET’S SHAPE YOUR WATER-PLAY ENVIRONMENT

Your place.
Our next adventure.

Share your site, intended users, utilities and scope. We’ll define the next design and engineering steps.

Fill in the project quotation form

AG ACTIVE PLAY™ · Discover. Move. Learn. Achieve. Share.

WhatsAppLet’s talk play ↗