Use this guidance to prepare a project brief. The selected OEM, appointed engineer and relevant authorities must confirm the final system, documents and site requirements.

Site investigation

Survey coordinates and levels, ground investigation, utilities, authority limitations, access and logistics.

Foundation engineering

Do not specify slab thickness or reinforcement before geotechnical design and receipt of structural base reactions from the actual OEM.

Drainage design

Assess runoff, substrate drainage, existing levels, approved connections and construction-stage water management.

Inspection controls

Hold points for excavations, subgrade, reinforcement, concrete, anchors, drainage and engineering release.

The uploaded historical civil-work instructions are reference examples, not universal UAE foundation prescriptions.
FROM GUIDANCE TO A CLEAR BRIEF

What does your project need?

Share the location, court quantity, site dimensions and delivery scope. We’ll help organise the questions for supplier and project review.

Start a project enquiry ↗Return to the court collection →
WhatsAppLet’s talk play ↗