AG Active Play™
Material submittals — illustrative project activity
AG ACTIVE PLAY™ / MATERIAL SUBMITTALS

Detail. Evidence. Confidence.

Evidence register and model-specific documents.

Discuss this workstream ↗
ILLUSTRATIVE PROJECT SCENE · NOT A DOCUMENTED AG PROJECT
PLANNING RESOURCE

Use this guidance to prepare a project brief. The selected OEM, appointed engineer and relevant authorities must confirm the final system, documents and site requirements.

ReferenceMaterialRequired evidenceCurrent status
MS-01Structural steelManufacturer data, steel grade certificates, connection drawings, calculations, coating evidencePending OEM verification
MS-02Tempered glassGlass data, test certificates, thickness and panel sizes, drilled-hole and isolator detailsPending OEM verification
MS-03Welded meshWire diameter, opening size, frame, corrosion protection and certificatesPending OEM verification
MS-04Artificial turfYarn/face weight, pile height, backing, infill, performance, UV and warrantyPending OEM verification
MS-05Sports lightingIES/LDT, photometric calculation, luminaire and driver data, IP/IK and compliancePending OEM verification
MS-06Foundation & anchorsEngineer-approved geotechnical inputs, foundation design, concrete and anchorsPending OEM verification
MS-07DrainageSite runoff assumptions, approved drainage layout, pipe details and test recordsPending OEM verification
MS-08Court accessoriesNet/post, doors, hardware, installation and inspection evidencePending OEM verification
Approval for a named project requires the real manufacturer record, revision, appropriate professional reviewer and project-specific approval trail. No documents here are approved for construction.
Request submittal package
PROCUREMENT TOOL / BLANK REQUEST TEMPLATE

Keep the evidence together.

Download the document-request checklist to record the issuer, exact OEM model, revision, reviewer and open actions. This blank template contains no manufacturer approval or certification.

Download submittal request checklist ↓Request document coordination ↗
FROM GUIDANCE TO A CLEAR BRIEF

What does your project need?

Share the location, court quantity, site dimensions and delivery scope. We’ll help organise the questions for supplier and project review.

Start a project enquiry ↗Return to the court collection →
WhatsAppLet’s talk play ↗